Hangzhou Waste Incineration Power Plant
Project Photos
Project Overview
Hangzhou Jiufeng Plant is a high-standard waste incineration power plant of Everbright International, located in the environmentally sensitive natural scenery area of Jiufeng Mountain. The total waste treatment capacity is designed to be 3,000 ton/day. In this project, Jiarong Technology undertook the leachate concentrate reduction subproject (450m³/d) and flue gas washing wastewater treatment subproject (180m³/d), which are large-scale leachate concentrate reduction treatment projects of waste incineration power plant.
Project Features
Large-scale leachate concentrate reduction project of waste incineration power plant with DTRO system in China
Classic case of flue gas scrubber wastewater treatment using membrane technology in China