The systematic solution for leachate treatment with the application of external TUF membrane has been provided by Jiarong for Laohukeng waste incineration power plant. The total treatment capacity is 1,745 m³/d. There are 50 units of M-C200-VFU100-08-3m MEMOS membrane modules applied in this project. This project is one of the typical large-scale leachate treatment projects with the external tubular membrane in the waste incineration power plant applied in China. The built units have been stable operating over 5 years.
Large-scale leachate treatment projects with the external tubular membrane in the waste incineration power plant
Installation of Jiarong FRP tubular membrane modules in a stable operation