The desulfurization wastewater of Guangdong Huaxia Yangxi Power Plant Phase II Units 5 and 6 (2*1240MW) Project Zero Discharge of Desulfurization Wastewater EP General Contracting Project is treated by Jiarong Technology Reverse Osmosis (STRO+DTRO) treatment system with high-fold concentration technology to reduce the volume of wastewater.
Treatment capacity: 48m³/h
Treatment process: pre-treatment + TMF + STRO + DTRO + slag flushing
Raw water TDS: 30-55g/L
System recovery rate: 60-75%
Desalination rate: 95-96%
Design pressure: 90 bar
Operating pressure: 65-80 bar
Share your leachate data and discharge requirements. We'll help assess a feasible and stable treatment approach. No obligation. Technical discussion first.
SubmitPlanning or Upgrading a Landfill Leachate Treatment System?
Contact Us