Customer Cases

Jiarong Technology provides one-stop solutions in wastewater treatment

Ordos Fracturing Reverse Drainage Fluid Treatment Project

Project Photos
Project Overview

This project is the Ordos Fracturing Reverse Discharge Fluid Reduction and Treatment Project, mainly the pre-treated pressure reverse discharge fluid industrial wastewater is reduced by DTRO system, with a treatment capacity of 250 tons per day.

Project Parameters

Treatment capacity: 250m³/d

Process: air flotation + coagulation and sedimentation + multi-media filtration + RO + DTRO + MVR evaporation

Raw water: TDS ≤20000mg/L

System recovery rate: 60%

Concentrate: TDS≤50000mg/L

Desalination rate: ≥96%

Operating pressure: 60-80bar

Business cooperation

Stay in touch with Jiarong. We will
provide you with one-stop supply chain solution.

Submit

Contact us

We are here to help! With just a few details we will be able to
respond to your inquiry.

Contact Us